Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment, Unpublished PhD Thesis, , University of Alabama.

Awolusi, I G (2017) Active construction safety leading indicator data collection and evaluation, Unpublished PhD Thesis, , University of Alabama.

Chau, A D (2018) Conceptual cost estimation decision support system in university construction projects, Unpublished PhD Thesis, , University of Alabama.

Egan, C M (1989) An evaluation of the effectiveness of the Mankato State university construction management program, Unpublished PhD Thesis, , University of Alabama.

Giron Matute, W A (2018) Sustainability analysis for construction companies under the LEED code, Unpublished PhD Thesis, , University of Alabama.

Harbin, K B (2020) A decision analysis tool for building renovations regarding adaptive reuse, Unpublished PhD Thesis, , The University of Alabama.

Hatamleh, M T (2020) Enhancing the management proficiencies in developing countries: The impact of project risk management within a project management maturity model on project performance, Unpublished PhD Thesis, , University of Alabama.

Macdonald, R N (2013) A strategy for materials price risk mitigation, Unpublished PhD Thesis, , The University of Alabama.

Mejia Aguilar, G (2013) Improving accuracy of project outcome predictions, Unpublished PhD Thesis, , University of Alabama.

Nguyen, T T (2017) Modeling of clt creep behavior and real-time hybrid simulation of a clt-lifs building, Unpublished PhD Thesis, , The University of Alabama.

Ogunrinde, O (2020) Enhancing quality management in highway construction using emerging methods, Unpublished PhD Thesis, , University of Alabama.

Okpala, I U (2022) Robotics and automation in construction: Developing foundational insight and tools to support safe implementation, Unpublished PhD Thesis, , University of Alabama.

Premraj, P (2017) Assessment of project controls for shutdowns/turnarounds/outages, Unpublished PhD Thesis, , University of Alabama.

Shen, X (2017) Location-based leading indicators in BIM for construction safety, Unpublished PhD Thesis, , University of Alabama.

Song, S (2017) Construction equipment travel path visualization and productivity evaluation, Unpublished PhD Thesis, , University of Alabama.

Stone, M L C (2013) Development of unit cost estimating models with respect to scale economies and material price volatility for use in probabilistic life cycle cost analyses, Unpublished PhD Thesis, , University of Alabama.

Thomas, W K (2013) The impact of RFP phase project scope development on the successful outcome of construction projects using the design build project delivery method, Unpublished PhD Thesis, , University of Alabama in Huntsville.

  • Type: Thesis
  • Keywords: private sector; construction project; delivery method; project delivery; project success; project manager; United States
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/1353111562
  • Abstract:
    The objective of this research was to determine whether a relationship exists between the level of scope definition during the Request for Proposal (RFP) phase of a construction project using the specific case of design build delivery method and the successful outcome of the project. Historically the literature suggests that project success varies with individual perspective and can include attributes beyond the classical metrics of cost and schedule. The data gathered for this research represents the perspective of the project manager. A new test instrument was developed to gage the level of design build construction project success and includes success metrics that go beyond classical measures of project success. Data was collected from seasoned project managers for twenty-six design build construction projects throughout the United States in the public and private sectors. The results of this analysis indicate that there is not a significant correlation between the overall upfront RFP scope development efforts and project success for the specific case of a construction project that utilizes the design build project delivery method. However, the data does show a relationship between the success of the execution phase of the design build project and the potential for a successful project outcome.

Watson, S V (2010) Pre-disaster planning for transportation infrastructure recovery, Unpublished PhD Thesis, , The University of Alabama at Birmingham.